Workflow

From UA Libraries Digital Services Planning and Documentation
(Difference between revisions)
Jump to: navigation, search
m (reflecting server switch from libcontent1 to libcontent)
(Digitization Workflow By Collection Type)
(2 intermediate revisions by one user not shown)
Line 1: Line 1:
== Digitization Workflow By Collection Type==
 
*[[Audio: Project Specifications and Workflow|Audio]]
 
*[[Manuscript items | Manuscript]] 
 
*[[Scanning_Sheet_Music|Sheet Music]] (this page needs updating as of 2009-09-18)
 
*[[Electronic Theses and Dissertations]]
 
*[[Undergraduate Research Projects]]
 
*[[Mass Digitization Workflow]]
 
 
 
==Overview of Workflow==
 
==Overview of Workflow==
 
*[[Set Up Collection]]
 
*[[Set Up Collection]]
Line 33: Line 25:
 
**On Selection spreadsheet, move the collection's line of data from DS_inProgress to DS_DigitizationComplete
 
**On Selection spreadsheet, move the collection's line of data from DS_inProgress to DS_DigitizationComplete
  
==Item-Level Workflow==
+
== Digitization Workflow By Collection Type==
*[[Checking Work By Object|Checking work as you go]]
+
*[[Audio: Project Specifications and Workflow|Audio]]
*[[Checking Work Daily|Checking work at the end of a period of capture]]
+
*[[Manuscript items | Manuscript]] 
 +
*[[Scanning_Sheet_Music|Sheet Music]] (we are no longer digitizing such collections)
 +
*[[Electronic Theses and Dissertations]]
 +
*[[Undergraduate Research Projects]]
 +
*[[Mass Digitization Workflow]]
 +
*[[Scrapbook Workflow]]
  
 
==Collection-Level Workflow ==
 
==Collection-Level Workflow ==
Line 42: Line 39:
 
*[[Moving Content To Long-Term Storage]]
 
*[[Moving Content To Long-Term Storage]]
 
*[[Metadata Movement]]
 
*[[Metadata Movement]]
 +
 +
==Item-Level Workflow==
 +
*[[Checking Work By Object|Checking work as you go]]
 +
*[[Checking Work Daily|Checking work at the end of a period of capture]]

Revision as of 13:45, 13 January 2014

Contents

Overview of Workflow

  • Set Up Collection
    • Obtain Materials
    • For new collections, on Selection spreadsheet, move the collection's line of data from Queue to DS_inProgress
    • For new collections, set up Folder Structure on Share Drive (or move one already set up by April, if found in S:\Digital Projects\Digital_Coll_in_progress\Digital_Coll_Waiting)
    • For new collections, Assemble/Create Collection Documentation
      • Make Collection information XML
      • Add columns from trackingcolumns_template.xlsx (in S:\Digital Projects\Organization\Digital_Program_Logs\TrackingFiles\TrackingFiles_database_files) to end of Metadata spreadsheet
  • Digitize Collection
    • Check Images against Metadata
    • Capture Images
    • Optimize Image Files
    • Track Progress as you go
  • Prepare Collection for Upload
  • Upload Collection to Acumen
    • Run script to create JPEGs and copy content to libcontent server
    • Run script to relocate content in libcontent server to Acumen directories
  • Move Collection to Storage Server
    • Run script to relocate original content from Share Drive to Storage Server
  • Complete Collection (when done capturing all material from collection)
    • On Selection spreadsheet, move the collection's line of data from DS_inProgress to DS_DigitizationComplete

Digitization Workflow By Collection Type

Collection-Level Workflow

Item-Level Workflow

Personal tools