Workflow

From UA Libraries Digital Services Planning and Documentation
(Difference between revisions)
Jump to: navigation, search
m (reflecting server switch from libcontent1 to libcontent)
m (some rearranging, changed note on sheet music workflow)
Line 2: Line 2:
 
*[[Audio: Project Specifications and Workflow|Audio]]
 
*[[Audio: Project Specifications and Workflow|Audio]]
 
*[[Manuscript items | Manuscript]]   
 
*[[Manuscript items | Manuscript]]   
*[[Scanning_Sheet_Music|Sheet Music]] (this page needs updating as of 2009-09-18)
+
*[[Scanning_Sheet_Music|Sheet Music]] (we are no longer digitizing such collections)
 
*[[Electronic Theses and Dissertations]]
 
*[[Electronic Theses and Dissertations]]
 
*[[Undergraduate Research Projects]]
 
*[[Undergraduate Research Projects]]
Line 32: Line 32:
 
*Complete Collection (when done capturing all material from collection)
 
*Complete Collection (when done capturing all material from collection)
 
**On Selection spreadsheet, move the collection's line of data from DS_inProgress to DS_DigitizationComplete
 
**On Selection spreadsheet, move the collection's line of data from DS_inProgress to DS_DigitizationComplete
 
==Item-Level Workflow==
 
*[[Checking Work By Object|Checking work as you go]]
 
*[[Checking Work Daily|Checking work at the end of a period of capture]]
 
  
 
==Collection-Level Workflow ==
 
==Collection-Level Workflow ==
Line 42: Line 38:
 
*[[Moving Content To Long-Term Storage]]
 
*[[Moving Content To Long-Term Storage]]
 
*[[Metadata Movement]]
 
*[[Metadata Movement]]
 +
 +
==Item-Level Workflow==
 +
*[[Checking Work By Object|Checking work as you go]]
 +
*[[Checking Work Daily|Checking work at the end of a period of capture]]

Revision as of 16:49, 21 August 2013

Contents

Digitization Workflow By Collection Type

Overview of Workflow

  • Set Up Collection
    • Obtain Materials
    • For new collections, on Selection spreadsheet, move the collection's line of data from Queue to DS_inProgress
    • For new collections, set up Folder Structure on Share Drive (or move one already set up by April, if found in S:\Digital Projects\Digital_Coll_in_progress\Digital_Coll_Waiting)
    • For new collections, Assemble/Create Collection Documentation
      • Make Collection information XML
      • Add columns from trackingcolumns_template.xlsx (in S:\Digital Projects\Organization\Digital_Program_Logs\TrackingFiles\TrackingFiles_database_files) to end of Metadata spreadsheet
  • Digitize Collection
    • Check Images against Metadata
    • Capture Images
    • Optimize Image Files
    • Track Progress as you go
  • Prepare Collection for Upload
  • Upload Collection to Acumen
    • Run script to create JPEGs and copy content to libcontent server
    • Run script to relocate content in libcontent server to Acumen directories
  • Move Collection to Storage Server
    • Run script to relocate original content from Share Drive to Storage Server
  • Complete Collection (when done capturing all material from collection)
    • On Selection spreadsheet, move the collection's line of data from DS_inProgress to DS_DigitizationComplete

Collection-Level Workflow

Item-Level Workflow

Personal tools