Quality Control

From UA Libraries Digital Services Planning and Documentation
(Difference between revisions)
Jump to: navigation, search
m (Quality Control moved to Ensuring Quality Work: Page was named "Quality Control" but since that's a specific process, the page was renamed to "Ensuring Quality Control".)
Line 2: Line 2:
  
 
[[Checking Work Daily|At Shift's End (Daily)]]
 
[[Checking Work Daily|At Shift's End (Daily)]]
 
[[Quality Control Check Preparation|Preparation for Check Phase (as needed)]]
 
  
 
[[Quality Control Check|During the Check Phase (Weekly)]]
 
[[Quality Control Check|During the Check Phase (Weekly)]]

Revision as of 12:15, 19 August 2010

As Students Work (Daily)

At Shift's End (Daily)

During the Check Phase (Weekly)

Determining what to do with weeded image files (as needed)


Per collection

see: http://www.lib.ua.edu/wiki/digcoll/images/0/0a/General_QC_guidelines.docx

This document covers script usage for individual image collections as well as guidelines for spot-checking and notation of issues discovered during Quality Control.

Personal tools